In recent years, fully automatic pvc twin wire crimping machine has been warmly welcomed by the majority of manufacturers in wire harness processing industry . It integrates a variety of processing functions. It saves a lot of manpower cost and improves production efficiency. So let’s take a look at what we should pay attention to today.
1. Is the power supply or air pressure normal
The voltage and air pressure of fully automatic pvc twin wire crimping machine are commonly used, so before starting the machine, the operator should confirm whether the power supply or air pressure switch is normal, and the normal operation can be achieved after the confirmation.
2. Connect the ground wire
Be sure to connect the ground wire to fully automatic pvc twin wire crimping machine, so as to release the static electricity, because the static electricity generated during the operation of the equipment may hurt the operator.
3. The machine needs lubrication
Before the operation of the machine, the operator should first carry out lubrication, check whether all screws are loose, and drain the water in the air circuit.
4. Add lubricating oil to the machine properly
Before the operation of the machine, the operator should lubricate it, check all screws for signs of loosening, and drain the moisture in the air circuit.
5. Pressure adjustment
The operator should adjust the pressure of the terminal machine, too small or too large is not good for the overall operation and service life of the terminal machine.
6. Speed adjustment
If the wire of the terminal machine is moved over the position, and the position of each wire is different, it means that the transmission speed of the machine is too fast and needs to be adjusted slowly. At this time, it is necessary for the operator to tighten the nut on the speed valve on the cylinder slightly, and then turn the speed regulating rod clockwise, so that the speed can be reduced.
7. Adjustment of cylinder
If the wire of fully automatic pvc twin wire crimping machine is moved, the position of each wire will change from left to right. The operator should first reverse link the air pipe of the crawler cylinder, then turn on the air source, place the groove of the wire clip in the middle of the cutter, remove the distance between the ratchet wheel and the pawl, and then tighten the screw to adjust the direction of the air pipe.